Synergix / Road haulage & freight
Building supplies and site delivery
Materials delivered around the site plan.
Get building materials from supplier or merchant to the place they are needed. Synergix arranges suitable vans, lorries and specialist unloading around the load, delivery slot and working conditions at your site.
UK & EuropeThe actual route and vehicle confirmed.
Fully insured transportCover checked for your goods and service.
Tracking & live PODVisibility and delivery confirmation.
24/7 operationsSupport when the job or timing changes.
What Synergix provides
Building Supplies and Site Delivery
Site delivery brings the goods, vehicle and receiving team together. We plan palletised materials, packs and awkward loads around access and unloading, with MOFFETT, HIAB or tail-lift arrangements where suitable. Material supply, installation and unrestricted on-site distribution are not automatic parts of the transport booking.
Keep work moving
Plan around material readiness
Give the supplier reference and the point at which the goods will be ready, as well as the site deadline. Identify which materials are critical to the next stage of work so the right consignment is collected and the receiving team is ready.
Choose unloading
Match the equipment to the job
A forklift, loader crane and tail lift solve different problems. Confirm load weights, packaging, ground and the required position. A site without a forklift may suit a MOFFETT or HIAB, but the actual operation still needs assessment.
Customers, goods and situations
Connect supplier release with the site programme
Get packed materials, long goods or urgent site items from the supplier to a prepared receiving team. The correct gate, unloading arrangement and latest useful arrival help the delivery support the next work phase.
Who needs building-material delivery?
A useful site movement connects the supplier’s release with a prepared receiving team and the actual unloading requirement.
Contractors and trades
Get the next work phase supplied
A missing component or released pack of materials can hold up a planned task. Identify the latest useful arrival and whether a smaller urgent consignment can solve the immediate need, with the remaining materials scheduled separately.
Merchants and manufacturers
Deliver an agreed customer order
Send the released packed load and collection reference, with the receiving site’s access and handling details. Supplier and site contacts help resolve a short order, changed packaging or receiving issue before it becomes a failed visit.
Project and landscaping teams
Match heavy packs to the set-down area
Bricks, timber, paving and similar packed materials can need different vehicles and unloading equipment. Show the complete route and prepared receiving area; an accessible gate alone does not establish forklift travel or crane placement.
Types of loads we transport
Select a category for the details that change the transport plan.
- Bricks, blocks and palletised materials
- Timber, sheet materials and long packs
- Steel and fabricated components
- Equipment and urgent site items
Bricks, blocks and palletised materials
Provide loaded pallet weights and sizes, packaging condition and quantities. A heavy pallet can affect vehicle payload and handling even when the overall order looks small. Include any pack splitting or placement request in the brief.
Timber, sheet materials and long packs
Length, bundle stability and weather protection matter. Send full dimensions and support instructions. An enclosed vehicle, curtainsider or open deck may be appropriate depending on the material and loading method.
Steel and fabricated components
Give drawings, gross weight, lifting/support points and any sharp edges or delicate finish. Crane unloading or a long vehicle must be planned with access, reach and set-down space checked.
Equipment and urgent site items
Tools, components and suitable equipment can use the vehicle size appropriate to the job. For an urgent small item, dedicated courier collection may help recover a delay without booking a large truck unnecessarily.
Jobs to plan together
These examples explain an enquiry brief. Your load and site determine the actual arrangement.
The job
Merchant collection for an active project
Materials are ready at a supplier and needed for a booked work phase. Send order references, packed quantities and site unloading details so collection and delivery fit together.
The job
A site without a forklift
The material needs self-unloading transport. Pack weights, lifting details and site photographs help decide whether a MOFFETT, HIAB or another arrangement is appropriate.
Vehicles and equipment
Explore the Synergix vehicle range
This is our wider fleet overview. The correct body, access, equipment and working capacity are confirmed for the named service and your goods. Each illustrated configuration has its own role; the overview does not mean every vehicle performs every service.
39 vehicle options. Browse horizontally or open the stationary guide.
Use the slider or arrows, or open the stationary vehicle guide.
Stationary vehicle guide and dimensions
| Vehicle | Load space | Payload / equipment | Booking check |
|---|---|---|---|
| Small van | 1.2 × 1 × 1 m | Up to 400 kg | Standard body guide; actual vehicle checked. |
| Short wheelbase van | 2.4 × 1.2 × 1.2 m | Up to 800 kg | Standard body guide; actual vehicle checked. |
| Long wheelbase van | 3.6 × 1.2 × 1.8 m | Up to 1,250 kg | Standard body guide; actual vehicle checked. |
| Extra long wheelbase van | 4.2 × 1.2 × 1.8 m | Up to 1,100 kg | Standard body guide; actual vehicle checked. |
| Luton van | 4 × 2 × 2 m | Up to 1,100 kg | 900 kg with a tail lift; conversion checked. |
| 7.5 tonne lorry | 6 × 2.2–2.4 × 2–2.445 m | Up to 2,400 kg | Standard body guide; actual vehicle checked. |
| 18 tonne lorry | 7.5 × 2.4 × 2.5 m | Up to 9,000 kg | Standard body guide; actual vehicle checked. |
| 26 tonne lorry | 8 × 2.5 × 2.6 m | Up to 15,000 kg | Standard body guide; actual vehicle checked. |
| 13.6m articulated lorry | 13.6 × 2.5 × 2.6 m | Up to 26,000 kg | Standard body guide; actual vehicle checked. |
| Luton curtainsider | Actual body specification confirmed | Load-specific capacity | Actual body, equipment and working payload checked. |
| 7.5t curtainsider | Actual body specification confirmed | Load-specific capacity | Actual body, equipment and working payload checked. |
| 18t curtainsider | Actual body specification confirmed | Load-specific capacity | Actual body, equipment and working payload checked. |
| Articulated curtainsider | Actual body specification confirmed | Load-specific capacity | Actual body, equipment and working payload checked. |
| 18t flatbed HIAB | Actual body specification confirmed | Load-specific capacity | Actual body, equipment and working payload checked. |
| 26t flatbed HIAB | Actual body specification confirmed | Load-specific capacity | Actual body, equipment and working payload checked. |
| Wagon & drag, rear HIAB | Actual body specification confirmed | Load-specific capacity | Actual body, equipment and working payload checked. |
| Wagon & drag, front HIAB | Actual body specification confirmed | Load-specific capacity | Actual body, equipment and working payload checked. |
| Three-axle HIAB tractor | Actual body specification confirmed | Load-specific capacity | Actual body, equipment and working payload checked. |
| Four-axle heavy HIAB tractor | Actual body specification confirmed | Load-specific capacity | Actual body, equipment and working payload checked. |
| HIAB artic & flatbed | Actual body specification confirmed | Load-specific capacity | Actual body, equipment and working payload checked. |
| Heavy HIAB artic & flatbed | Actual body specification confirmed | Load-specific capacity | Actual body, equipment and working payload checked. |
| 26t flatbed MOFFETT | Actual body specification confirmed | Load-specific capacity | Actual body, equipment and working payload checked. |
| 26t curtainsider MOFFETT | Actual body specification confirmed | Load-specific capacity | Actual body, equipment and working payload checked. |
| Artic flatbed MOFFETT | Actual body specification confirmed | Load-specific capacity | Actual body, equipment and working payload checked. |
| Artic curtainsider MOFFETT | Actual body specification confirmed | Load-specific capacity | Actual body, equipment and working payload checked. |
| Articulated flatbed | Actual body specification confirmed | Load-specific capacity | Actual body, equipment and working payload checked. |
| Refrigerated trailer | Actual refrigerated space confirmed | Refrigerated trailer option | Actual body, equipment and working payload checked. |
| Double-deck box trailer | Actual body specification confirmed | Load-specific capacity | Actual body, equipment and working payload checked. |
| Double-deck curtainsider | Actual body specification confirmed | Load-specific capacity | Actual body, equipment and working payload checked. |
| Tanker trailer | Actual body specification confirmed | Load-specific capacity | Actual body, equipment and working payload checked. |
| Skeletal container trailer | Actual body specification confirmed | Load-specific capacity | Actual body, equipment and working payload checked. |
| Walking-floor trailer | Actual body specification confirmed | Load-specific capacity | Actual body, equipment and working payload checked. |
| Step-frame trailer | Actual body specification confirmed | Load-specific capacity | Actual body, equipment and working payload checked. |
| Bulk tipper trailer | Actual body specification confirmed | Load-specific capacity | Actual body, equipment and working payload checked. |
| Alloy U-shaped tipper | Actual body specification confirmed | Load-specific capacity | Actual body, equipment and working payload checked. |
| Low-loader | Actual body specification confirmed | Load-specific capacity | Actual body, equipment and working payload checked. |
| Megalift trailer | Actual body specification confirmed | Load-specific capacity | Actual body, equipment and working payload checked. |
| Purpose-built keg trailer | Keg layout and usable space confirmed | Actual trailer payload confirmed | Purpose-built keg trailers and other suitable vehicles are both used. Trailer layout, load restraint and unloading method are agreed for the job. |
| Wagon and drag MOFFETT | Both decks and forklift position confirmed | Actual completed combination payload confirmed | The carried forklift changes equipment position and freight allowance. Confirm the actual forklift, mounting, load-centre limits, ground and access. |
From brief to completion
How the service works
Agree the goods, timing, equipment and responsibilities so collection and handover follow one workable plan.
- Check the supplier release
Confirm the order reference, exact packed materials, weights, goods-ready time and loading contact. Explain anything being left for a later collection.
- Brief the receiving site
Send the correct gate, route restrictions, slot, unloading area and active site contact. Identify required equipment and any placement beyond normal unloading.
- Agree the transport and handover
Confirm vehicle, loading/unloading responsibilities, site requirements, timing and quotation. Separate urgent items from phased or return work.
- Prepare, collect and deliver
The supplier releases the agreed goods and the site makes the booked receiving arrangement available. Report changed readiness, access or equipment before the movement proceeds.
- Record receipt and exceptions
Delivery confirmation records the handover, with shortages, damage or access concerns raised through the agreed contacts. Returns or a revised delivery need their own agreed plan.
Practical booking help
Prepare the merchant and receiving-site brief
Start with reliable goods information and the people releasing and receiving the consignment. Flag missing details rather than guessing.
Loading, unloading and access
Give us the actual conditions at both ends so the equipment and service can be agreed before dispatch.
Check 01
The actual entrance
Give the delivery gate, approach roads, height/width/weight restrictions and turning room. A postcode can lead to the wrong entrance. Send site directions and a named contact.
Check 02
Unloading and placement
State who provides the equipment, who controls the unloading area and where the goods must be left. Carrying, repeated on-site moves, crane placement and opening packs need an agreed scope.
Check 03
Timing and site rules
Send delivery slots, inductions, PPE/access rules and any accreditation requirement early. We check suitability before booking rather than claim universal approval for every construction site.
Booking your first site delivery
Collect the information from the merchant and site team. We can then assess the vehicle and unloading together.
Ask the supplier
Get the packed transport details
Use the order or packing schedule, with package count, packed dimensions and gross weights including pallet/bearers. Add any long projections, weather-sensitive finishes or lifting instructions. Confirm release authority, readiness and the equipment used to load. Flag uncertain figures rather than estimating a heavy pack.
Ask the site
Show the gate and working route
Provide the actual delivery entrance, approach restrictions, turning area, slot and named receiver. Ask for site traffic instructions, induction and required approval/equipment details before booking. Keep delivery activity separated from pedestrians and other site operations through the site’s agreed controls.
Choose the handling scope
Say where the materials must finish
A tail lift lowers compatible goods to a suitable receiving surface. A MOFFETT carries suitable loads on forks along an assessed ground route. A HIAB performs an assessed lift. Show the exact position, surface, distance and obstacles, and declare any separate carrying or repeated distribution around the site.
Reasons to choose Synergix
Practical capability and accountable support
The service brings suitable equipment, visibility and an active operations team together around your requirements.
Synergix
Connect supplier readiness with the site programme
Plan the collection, vehicle and unloading around the materials actually ready and the work phase that needs them. A suitable urgent van can help with a small missing item, while larger loads and self-unloading equipment are arranged around the complete site brief.
Synergix
Tracking and live POD
Live tracking and electronic proof of delivery (POD) help your team follow the movement and confirm receipt. Registered customers can book jobs, track drivers and retrieve PODs through the customer portal. Agree access and any extra reporting for the work.
Synergix
Fully insured transport
Move your goods with insured transport. Confirm the applicable cover against the consignment, declared value and booked service.
Synergix
24/7 operations support
Reach the team when timing or site conditions change. Clear communication and practical action help keep the movement under control.
Synergix
UK and European capability
Use an established UK and European transport operation, with the actual route, equipment and availability confirmed for the work.
Synergix
Experience with accountability
Three generations of family transport experience support practical decisions about the job. Synergix is trusted by some of the largest businesses in the sectors it serves.
Price, quotation and supplier review
Quote the complete requirement
Send the goods, sites and timing together, including the handling, evidence or additional duties your organisation needs.
- Material scheduleDescription, pack/pallet count, loaded dimensions, weights and supplier references.
- Unloading methodForklift, HIAB, MOFFETT, tail lift or other equipment; exact set-down position.
- Site accessCorrect gate, approach restrictions, turning space, ground and photographs.
- Site programmeReady time, delivery slot, contact, induction and any specific approval requirement.
- Collection and deliveryExact addresses, contacts, dates, latest useful arrival and any extra stops.
- Value and special conditionsDeclared goods value, handling instructions, required cover and any regulated or restricted contents.
Timing and price factors
A clear brief lets us quote the service your work needs.
Coverage and availability
Agree the workable schedule
One-off and repeat UK site deliveries can be planned around supplier readiness and site windows. Suitable urgent courier collections can be available within 60 minutes, subject to location and availability. Specialist trucks and unloading equipment are confirmed separately.
Quotation
What affects the price
The material size/weight, route, vehicle, unloading method, site time, waiting and appointment restrictions affect the quote. Supply a complete material schedule and explain any placement beyond normal unloading.
Agree the delivery responsibilities and changes
A useful quotation covers the material release, transport and receiving operation, with any extra handling visible from the start.
Operating brief
Coordinate suppliers and work phases
List suppliers, release references, goods, firm dates, forecasts, receiving space, site slots and return movements. Agree who can authorise substitutions, partial collections or changed positions and who reports readiness or access problems. Tracking and POD support the handover; request extra reporting explicitly.
Supplier and commercial review
Raise site requirements before commitment
Send exact accreditation, vehicle, competence and cover requirements to sales for review against the booked task. Discuss waiting, extra stops, changed equipment, carrying and redelivery before commitment. Provide PO and invoice references and any proposed account/payment requirements for agreement.
Useful booking questions
Building supplies and site delivery FAQs
Direct answers to the choices and practical requirements that affect this service.
Can you collect from a builders’ merchant?
Yes. Give the order reference, goods-ready time, packed dimensions and weight, collection rules and the site delivery details. The merchant must release the correct goods.
Can you deliver without a site forklift?
Yes, where suitable self-unloading transport is agreed. MOFFETT, HIAB and tail-lift options have different load, surface and access requirements, which must be checked.
Can materials be placed where the trades need them?
An accessible placement point can be discussed. Provide distance, ground, obstacles and any lifting requirement. Transport does not automatically include unrestricted movement around the site.
Can you deliver long timber or steel?
Suitable long loads can be assessed. Send the full length, width, weight, packaging and support/lifting instructions so a suitable body and route can be selected.
Do you supply the materials?
This page covers transport of your goods. The supplier order, quantities and release authority need to be arranged. Material purchase is not automatically included.
Can you work to a booked site slot?
Yes, subject to planning. Send the slot, gate, induction requirements and last acceptance time, with a site contact who can authorise unloading.
Does every delivery vehicle have a tail lift?
No. Equipment must be specified. The vehicle, platform capacity, loaded weight, dimensions and receiving ground must suit the job.
What about an 800 kg pallet?
Where pallet-truck handling is needed for an individual loaded pallet of 800 kg or more, arrange an electric pump truck. Lower weights can also need powered equipment after assessment.
Can you meet a site accreditation requirement?
Tell us the exact requirement before booking. Suitability and evidence must be checked for the actual vehicle and job. No blanket accreditation claim is made.
Can you collect unused materials afterwards?
Returns can be arranged if the goods, packaging, supplier acceptance and loading method are confirmed. Include the return movement in the quote or contact us before the plan changes.
What should I ask the merchant before arranging collection?
Ask for the release reference, goods-ready time, collection opening hours and the packed quantity, outer dimensions and gross weight of each pack or pallet. Confirm who loads the vehicle and whether there are collection bookings or account/release conditions. Send the actual collected load details, rather than assuming the product’s loose or unit dimensions describe the transport package.
Can you split deliveries around the phases of a project?
Yes, a phased programme can be assessed. Give the goods and supplier for each collection, required dates or work phases, receiving space and unloading arrangements. State which dates are firm and how changes will be authorised. A programme still needs confirmed releases and suitable capacity for each agreed movement.
Does site delivery include carrying materials inside or upstairs?
Only when that additional handling is specifically agreed. Identify the whole route, distances, stairs/lifts, doorways, item weights and required finish point before quoting. A tail lift, MOFFETT or crane solves a particular unloading task; it does not automatically include unpacking, hand-carrying, installation or distributing goods around the building.
Talk to the team
Arrange your site delivery
Send the goods, collection and delivery requirements. We will bring the service scope, suitable equipment and quotation together.
Need a load-size check? Open LoadCheck and vehicle guidance.